Build 15: Studio A
Built 2020–22. The walls were framed and painted in May 2020. It was finished in January 2022 with a red-and-black geometric mural and a front desk.
12 photos. Select any photo to open the full-screen viewer. Use the arrow keys or swipe to move between photos, and Escape to close.
Page last updated: November 17, 2026
